Japan Suspends Nuclear Fuel Removal From Fukushima Plant.


Japanese energy company Tokyo Electric Power Co. has suspended the operation to remove molten radioactive fuel from the bottom of one of the damaged reactors at the Fukushima nuclear plant due to a technical malfunction, Bloomberg reports.
The company began a demonstration process for removing fuel at the Fukushima Daiichi plant last week but was forced to halt the procedure on Tuesday after two cameras on the extraction device stopped working, Nikkei reports, citing a company statement.
Technical Malfunction Halts Radioactive Fuel Extraction Process
This technical issue is the latest complication in the process of extracting molten fuel and decommissioning the plant, which will take decades and cost 23 trillion yen ($164 billion). The process was initially planned to start last month but was delayed due to a procedural error.
A robotic arm resembling a fishing rod with a claw-shaped metal gripper has been developed to collect small amounts of debris for the extraction of radioactive material.
Source: Economic Truth
Read also
- Front Line as of May 15. Summary of the General Staff
- Zelensky's Visit to Turkey, Start of Negotiations with the RF. Main Points from May 15
- We cannot chase Putin around the world: Zelensky sends delegation for negotiations in Istanbul
- Enemy losses as of May 15, 2025 – General Staff of the Armed Forces of Ukraine
- Sybiga met with Rubio and Graham, composition of delegations from the Russian Federation and Ukraine: main news of the night
- A Day of Mourning Declared in Sumy After Russian Strike