There are installations, there is no money: why Ukrainian cities may remain without light and heat in winter.
29.11.2024
2009

Journalist
Shostal Oleksandr
29.11.2024
2009

Ukraine is facing problems with the installation of gas piston units (GPU) that are supposed to provide backup power supply during outages. According to an expert, only 35 out of 91 GPUs have been installed so far. Many cities do not have the funds to connect this equipment. Even regional centers are facing this issue, as some are not receiving GPUs from the authorities. However, Khmelnytsky managed to solve this problem back in 2009 and successfully uses GPUs during power outages. The expert urges local authorities to allocate funds for communal needs, which will ensure the proper functioning of critical infrastructure even during outages.
Read also
- Operation Under Cover: CNN Learned How Trump Prepared Strikes on Iran
- Trump sent Kellogg to Lukashenko to resolve the 'Ukrainian issue': NYT revealed the details
- Iran is ready to cut off oil to the whole world after US strikes: what we know
- The Ground Forces revealed the details of the Russian strike on the Armed Forces training ground
- Minister Chernyshov returned to Ukraine after wave of rumors about his escape
- Everything Destroyed: Trump Reveals Details of Operation Against Iran